Skip to main content

OD19039 – ITT/731/MCX/18 – Installation, Commissioning and Startup of New Steam Turbine “B” at Mellitah Complex

الموقع

Mellitah Complex – Libya

الحالة

 مكتمل

التصنيف

الخدمات والصيانة

INSTALLATION, COMMISSIONING AND STARTUP OF NEW STEAM TURBINE “ B” AT MELLITAH COMPLEX – PROVISION OF MANPOWER FOR THE CIVIL RESTORATION OF TURBINE FOUNDATION, LIFTING & MANEUVERING & INSTALLATION OF THE TURBINE ON TO THE FOUNDATION , ROTATING , SHAFT ALIGNMENT, LUBEOIL SYSTEM PREPARATION, GE MKVIE CONTROL SYSTEM, POWER CABLES, INSTRUMENT AND CONTROL CABLES, FIRE FIGHTING SYSTEM, COUPLING, ACOUSTIC ENCLOSURE, PRE-COMMISSIONING AND STARTUP. RENTAL OF SPECIAL EQUIPMENT AND TOLLS INCLUSIVE OF ALL REQUIRED LIFTING CRANES SUCH AS 220 TONNE MOBILE CRANES & 45 TONNE CRANE & FORKLIFT. ETC.

صور المشروع

لنعمل معًا!

Interested in working with us? Contact us and our dedicated teams will be ready to assist you.

نموذج الاستفسار

RFQ

أقصى حجم مسموح به: 5.12MB