INSTALLATION, COMMISSIONING AND STARTUP OF NEW STEAM TURBINE “ B” AT MELLITAH COMPLEX – PROVISION OF MANPOWER FOR THE CIVIL RESTORATION OF TURBINE FOUNDATION, LIFTING & MANEUVERING & INSTALLATION OF THE TURBINE ON TO THE FOUNDATION , ROTATING , SHAFT ALIGNMENT, LUBEOIL SYSTEM PREPARATION, GE MKVIE CONTROL SYSTEM, POWER CABLES, INSTRUMENT AND CONTROL CABLES, FIRE FIGHTING SYSTEM, COUPLING, ACOUSTIC ENCLOSURE, PRE-COMMISSIONING AND STARTUP. RENTAL OF SPECIAL EQUIPMENT AND TOLLS INCLUSIVE OF ALL REQUIRED LIFTING CRANES SUCH AS 220 TONNE MOBILE CRANES & 45 TONNE CRANE & FORKLIFT. ETC.
PROJECT GALLERY
LET’S WORK TOGETHER
Interested in working with us? Contact us and our dedicated teams will be ready to assist you.