INTECH HAS RECEIVED ANOTHER ORDER FOR THE SUPPLY OF CONTROL VALVES & PRESSURE SAFETY VALVE FOR SABRATHA OILY WATER SYSTEM UPGRADE PROJECT PHASE-II
| الأخبار
OD18090- INTECH has received an order for the supply of the Control Valves and Pressure Safety Valves for Sabratha Oily water system upgrade project phase – II.
We are very much thankful to Mellitah Oil and Gas company.
اترك تعليقاً