REPLACEMENT OF DEFECTIVE SULPHUR ANALYZER IN SALES GAS AREA- P1 40180AT 545.
Brief Description of Work:
In order to achieve the completion of replacement of defective sulphur analyzer, the following steps must to be achieved:
- To inspect actual condition of the analyzer ( received in 2014 ) in the W/H
- To check the warranty and condition of gas cylinder ( will expire in August 2016)
- To identify the proper procedure to dismantle the defective analyzer from the shelter 40-180-JA-003
- To disconnect the cable and adjacent piping’s of actual analyzer and remove from shelter
- Check the if the length of cables , piping’s position if is required to be adjusted
- To instate the new analyzer and reconnect to the system (calibration, implement in DMS )
- Perform the field training for MOG personnel