Project Update: INTECH & WAHA – Replacement of Damaged Ring Main & Auto Fixed Foam Firefighting System at Es Sider Terminal.
| News
INTECH, in partnership with WAHA Oil Company, is nearing completion of the Engineering Phase for the Es Sider Firefighting System Renewal Project. The design packages, specifications, and safety deliverables are being finalized in preparation for the HAZOP review and design freeze, which will mark the transition to the Procurement Phase.
The upcoming stage will focus on vendor selection, material sourcing, and logistics planning to ensure smooth execution of installation and commissioning works.
This milestone reflects the strong collaboration and dedication of both INTECH and WAHA teams toward enhancing safety, reliability, and operational excellence at the Es Sider Terminal.
Leave a Reply