OD19022-TENDER NO: TN/751/WAFA/18 – WAFA PIPELINE PROJECT- AWARD NOTIFICATION

    |

    CLIENT : MOG

    Scope of Work:

    This Gas Pipeline would initially consist of 10 inch (API 5L GR X65, 14.3 mm thickness) for approx the first 4.3 km, and then be directly connected with a reducer to an 8 inch (API GR X65, 12.7 mm thickness) for approx the remaining 1.7 km. The total Pipeline length would be approximately 6 km.

    Leave a Reply

    Your email address will not be published. Required fields are marked *