Successful Completion of GreenStream Gas Turbine B Major Inspection and 72-Hour Reliability Test at Mellitah Complex Site, Libya.
Industrial Technology oil Services (INTECH) is pleased to announce the successful completion of the major inspection and subsequent testing of Gas Compression Station B360 MT 001, Unit #B (Gas Turbine B), at the Mellitah Complex Site.
The unit successfully concluded its rigorous 72-hour reliability test, demonstrating exceptional performance following the major maintenance and inspection campaign.
Key Outcomes:
- Flawless Performance: The Gas Turbine operated continuously and without incident for the entire 72-hour period.
- Optimal Operation: All monitored machine parameters and operational data were verified and confirmed to be well within acceptable tolerances, affirming the quality of the maintenance work performed.
- Operational Readiness: The successful completion of this test is a critical step, confirming the unit’s readiness for reliable long-term service and its ability to contribute fully to the stability and throughput of the Gas Transmission System (GTS).
This achievement underscores INTECH’s commitment to maintaining the highest standards of asset integrity, reliability, and safety across its operations at the Mellitah Gas Compression Station. The return of this critical turbine to service ensures the continued efficient and reliable transportation of natural gas through the Mellitah Gas Compressor Station (MGCS).
Leave a Reply